pull down to refresh

Why according to Loop's calculator if I put 200 confirmations it gives a low risk and 1000 confirmation 100% risk?
There appears to be a bug in the calculation and anything over 808 confirmations at 48 percent of the hash rate says 100 percent reorg risk. 800 confirmations fives 5 percent reorg risk and if that calculation is correct than every confirmation after that will be lower than 5 percent.
reply