pull down to refresh
103 sats \ 3 replies \ @Undisciplined 16 Apr 2024 \ on: Closed Loop Thinking vs Open Loop Thinking mostly_harmless
Fellow open looper here.
I like to think about this in terms of the 80-20 principle. We can get five projects to 80% in the same time a closed looper gets one project done.
In a lot of cases, 80% is good enough, anyway, so we're basically 5x as productive.
I think this is about the open loops where not doing the last 20% gets more expensive over time and you can usually not escape from them.
Did you only read 80% of the text? 👀
reply
I'm sure they do. That's why you need a closed looper to finish them up for you.
reply
lol, teamwork
reply