0 sats \ 2 replies \ @BTCMiner OP 28 Apr 2022 \ parent \ on: ERCOT (Texas) projecting 17 GW for bitcoin mining in 2026 bitcoin
The chart is from a document (see below) titled:
Overview of Large Load Interconnection Requests
This Tweet suggests performing word substitution is not entirely wrong:
the task force was created specifically to address crypto IX's. So there is likely some real data center load in there but i'd wager 80%+ of it is mining
reply
Source for the chart:
Which is, with other documents, shared here:
ERCOT Large Flexible Load Task Force
https://www.ercot.com/calendar/event?id=1649295264273
reply