pull down to refresh
0 sats \ 3 replies \ @BTCMiner OP 28 Apr 2022 \ on: ERCOT (Texas) projecting 17 GW for bitcoin mining in 2026 bitcoin
The full contents of that Tweet:
The chart is from a document (see below) titled:
Overview of Large Load Interconnection Requests
This Tweet suggests performing word substitution is not entirely wrong:
Bitcoin miners cough cough large flexible loads
reply
the task force was created specifically to address crypto IX's. So there is likely some real data center load in there but i'd wager 80%+ of it is mining
reply
Source for the chart:
Which is, with other documents, shared here:
ERCOT Large Flexible Load Task Force
https://www.ercot.com/calendar/event?id=1649295264273
reply