pull down to refresh

Jargon point: ah, thanks! I was intentionally avoiding calling the subsidy a subsidy for some reason (which I cannot make sense of at the moment).
simply by replacements being incremented in smaller steps
This is a great point. Who's gonna fee bump by 1 sat/vB when they can fee bump by 1 sat? (Perhaps an exaggeration on my part).