pull down to refresh
21 sats \ 1 reply \ @BlokchainB 6 Jun \ on: World’s highest railway arch bridge ‘taller than Eiffel Tower’ opens in India Construction_and_Engineering
Do you have a cost and duration for this marvel?
Around $180 Million and it took around 5 years (2017-2022) for the Chenab arch bridge.
You can see all the information here
https://en.m.wikipedia.org/wiki/Chenab_Rail_Bridge
The Anji Khad bridge was just completed in 11 months' record time!
reply