pull down to refresh

Skanska USA was awarded a $450 million contract to replace the Lindsay C. Warren Bridge

The project will replace the current 65-year-old swing-span bridge with a modern two-lane fixed-span, high-rise bridge just north of the current bridge. The new bridge will include two, 12-foot travel lanes with 8-foot breakdown lanes