pull down to refresh
160 sats \ 0 replies \ @Satosora 9 Jan \ on: AECOM Selected to Deliver Austin's First Light Rail System, for 74,677 BTC Construction_and_Engineering
I hope they plan ahead and design it carefully.
Dont want to end up with wasted stations everywhere.