USD/BTC = $101,026
Block 874,306
Clark Construction breaks ground on a $947 million forensic hospital in Washington state, aiming to transform mental health access. The 467,000-sq.-ft. facility will house 350 beds and feature innovative design for holistic patient treatment. Completion set for 2028.
The forensic behavioral health hospital will provide skilled psychiatric treatment in a secure, therapeutic setting. The scope includes a 53,000-sq.-ft. administrative building.
This project has the capability to transform the access to mental health in this region, and we can't wait to start the construction phase."
Work began in the spring of 2024, with the demolition of 11 existing outdated structures across 35 acres to prepare the site for vertical construction. Project completion is slated for 2028.
Washington State investing in a mental health hospital is a step in the right direction!