pull down to refresh

What would scale your work by 10x? What would have to happen?
I’m not great at prioritizing the most important task. I guess if that were different, my Bitcoin Core contributions would move a lot quicker, but on the other hand, I’d probably not have ~1900 posts on Bitcoin Stack Exchange and done over 8300 edits to posts there. I’d probably also not be posting on SN and Twitter as much, or co-host BitDevs. I’d probably be a more effective contributor if I were working more closely with a few people on one project rather than trying to do a dozen things at a time.
I like to think that some of the educational work I’ve done to help on-board people has led to more work being done on some projects overall than if I had worked on them directly.
Let me know if you have some good ideas how I could scale my impact, I’d be curious about an outsider perspective on that one.
reply