pull down to refresh
100 sats \ 0 replies \ @random_ 7 Jun 2022 \ parent \ on: Daily discussion thread
Paraphrase from my slides/the paper I'm summarizing:
An attachment strategy S takes as params G,k,cap where G is a snapshot of the lightning network, k is the budget (# of channels), and cap is the capacity and returns a list of nodes with which to open channels.
Note that the authors don't consider nodes with pre existing channels. This is a strategy for a joining node to use.