pull down to refresh
8 sats \ 1 reply \ @Majjin 8 Apr 2022 \ parent \ on: Tesla, Block and Blockstream team up to mine bitcoin off solar power in Texas bitcoin
Back of the napkin math tells me that full charged, the battery storage is enough to power 76 S19s for two days (100TH, 3.25 kw version).
The target of 30 petahash/s sounds like a lot of hashpower. https://blog.blockstream.com/blockstream-and-block-inc-s-solar-mining-facility-now-powered-by-tesla-solar-pv-and-megapack/
reply