pull down to refresh
And ... the lumber I had cut was cut to the wrong length, 1 inch short. They must've misheard me when I gave them measurements. $200 for lumber I can't use. Garsh.
jfc lumbar is expensive :(
deleted by author
Consider cutting one down as a 1 inch filler and putting it lengthwise? :) (It's funny how I'm missing carpentry vocabulary in English...)
Yeah I can just fill it with more lumber, which might be the best move. Apparently these things only really work if it's an airtight seal, so more pieces will create more cracks but it'll be better than nothing.
Maybe also fill it with foam? That would imo add to sound isolation
Yeah going to fill it with mineral wool insulation. Basically I’m building a wall on my window sill.
deleted by author
deleted by author
deleted by author
deleted by author
Dear journal (lol),
Got like 30 twitter followers today. I'm not sure where they came from.
Going to pause the window plug project until next weekend I guess.
Oh its that this tweet got picked up https://twitter.com/k00bideh/status/1505340980270096387. Also, the user who sent it let me know it was them after seeing the tweet.
I think someone also randomly sent me a 60,000 sats via lightning address yesterday too. I really need to set up notification for those.
Is that like onlyfans?
Yeah except you show us your brain rather than your body.
LOLs
deleted by author
deleted by author
deleted by author
deleted by author
deleted by author
Booking my Miami flight today. I had already book a hotel but was waiting to here back about Pitch Day before booking a flight.
After that it's back to building my window plug. I got all the materials except for the mineral wool insulation which must be suffering supply chain issues because everywhere is out of it.